Posición: Mid-Senior level

Tipo de empleo: Full-time

Loading ...

Contenido de trabajo

Main Tasks

•Contribute to the elaboration of the software specification & architecture, in collaboration with the software architect

•Develop software components: C++

oPerform the software components detailed design & coding

oSet up the software development tool chain

oSpecify, design, prepare and perform tests and verifications of his / her deliverables

oPut software work products under configuration management

oSupport software / software integration, together with the other software designers

oSupport hardware / software integration, together with the hardware designers

•Sustain the software

•Keep informed of the evolution of technologies through techno watch

•Contribute to standardization by reusing existing solutions or by implementing reusable solutions, including COTS (Commercial Off-The-Shelf)

Accountability

•Design software components and implement them

•Ensure QCD management on software development activities

Loading ...
Loading ...

Plazo: 26-12-2025

Haga clic para postularse como candidato gratuito

Aplicar

Loading ...