Software Designer Programs/Projects (Non Emb SW)
Vue: 150
Jour de mise à jour: 11-11-2025
Localisation: Charleroi Hainaut
Catégorie: Direction Production/Opération
Niveau: Mid-Senior level
Type d’emploi: Full-time
le contenu du travail
Main Tasks
•Contribute to the elaboration of the software specification & architecture, in collaboration with the software architect
•Develop software components: C++
oPerform the software components detailed design & coding
oSet up the software development tool chain
oSpecify, design, prepare and perform tests and verifications of his / her deliverables
oPut software work products under configuration management
oSupport software / software integration, together with the other software designers
oSupport hardware / software integration, together with the hardware designers
•Sustain the software
•Keep informed of the evolution of technologies through techno watch
•Contribute to standardization by reusing existing solutions or by implementing reusable solutions, including COTS (Commercial Off-The-Shelf)
Accountability
•Design software components and implement them
•Ensure QCD management on software development activities
Date limite: 26-12-2025
Cliquez pour postuler pour un candidat gratuit
Signaler des emplois
MÊMES EMPLOIS
-
⏰ 18-12-2025🌏 Mons, Hainaut
-
⏰ 30-12-2025🌏 Lessines, Hainaut
-
⏰ 23-12-2025🌏 Ath, Hainaut
-
⏰ 23-12-2025🌏 Comines-Warneton, Hainaut
-
⏰ 23-12-2025🌏 Charleroi, Hainaut
-
⏰ 23-12-2025🌏 Ath, Hainaut
-
⏰ 30-12-2025🌏 Tournai, Hainaut
-
⏰ 17-12-2025🌏 Mons, Hainaut
-
⏰ 22-12-2025🌏 Mouscron, Hainaut
-
⏰ 18-12-2025🌏 Mons, Hainaut